SEMCO Operations Center - Battle Creek


Owner:                 SEMCO Energy
Project Size:       38,000 Sq. Ft.
Project Cost:      $800,000
Date Completed: August 2010

Project Description: SyDesign was retained by SEMCO Energy to renovate an existing FedEx building to be utilized as their Western Michigan district operations center. The layout included an office area, warehouse space for gas meters, a meter repair shop including a paint booth, and vehicle storage space. Existing walls were used in as many locations as possible in order to reduce the cost. SyDesign provided SEMCO with interior design services to update the existing office area.