Speedy Q By/Lo


Owner:                     By-Lo Speedy Q Markets
Project Cost:           $1,800,000 Total
Project Size:           2,800 Sq. Ft.   10 Fuel Pumps
Date Completed:    December 2005

Project Description: SyDesign was commissioned by Bi-Lo/Speedy Q Markets as the architect for a 2800 Sq. Ft. convenience store and gas station which will represent the companies standard building profile and imaging for future stores and expansion. The facility utilizes a condensed building footprint to maximize efficiencies.  The fueling canopy covers 10 pump islands, while the fueling tank farm provides both gasoline and ethanol pumping and mix capabilities. The design team utilized a traditional design.bid.build approach and completed the facility in 5 months time including design and construction.